RESEARCH RESTART

The Libraries are resuming limited in-person research activities by appointment only as part of the University's Research Restart Plan.
Learn more about the Libraries' entry requirements and available services.

Sundial Returns to Engineering Center

April 3, 2013
Bracewell Sundial

The sundial from the Terman Engineering Building has been re-mounted on the south side of  Huang Engineering Center near the main bike rack area next to the bridge.  The sundial was originally installed on the Terman Building in 1997 by Prof. Ronald N. Bracewell.  It was built by Prof. Bracewell and his son Mark.  Read more about the sundial in the March 1997 Civil Engineering at Stanford Newsletter on page 17.

accessibilityaccessprivsarrow-circle-rightaskus-chataskus-librarianbarsblogsclosecoffeecomputercomputersulcontactsconversationcopierelectricaloutleteventsexternal-linkfacebook-circlegroupstudyhoursindividualinterlibrarynewsnextoffcampusopenlateoutdoorpeoplepolicypreviousprinterprojectsquietreservesscannersearchstudysupportingtabletourstwitter-circleworking